Potato Full-Process Mechanization
Back to solutions

Agricultural Machinery

Potato Full-Process Mechanization

500–5,000 mu | North China · Northwest China · similar Central Asian climates | growers/farms

Project requirement

Once the planted area exceeds 500 mu, labor becomes the biggest uncertainty: planting must catch the right soil moisture, harvesting must catch the narrow window, and every extra skin break lowers the selling price by a grade. This solution fully mechanizes planting, vine cutting, harvesting, and cleaning, with all four operations supplied from one source, mutually compatible specifications, synchronized arrival, and one party responsible for after-sales service.

Equipment list

OperationEquipmentSuggested specificationFactory
PlantingPotato planter2CM series; film-compatible model where requiredQingdao Hongzhu - Factory verified
Pre-harvestPotato vine cutterMatched to ridge spacingQingdao Hongzhu - Factory verified
HarvestingPotato harvester4U single-row / double-row, selected by areaQingdao Hongzhu - Factory verified
Post-harvestSoil-return cleaning equipmentMatched to target harvesting capacityQingdao Hongzhu - Factory verified

Configuration logic

1

Area determines the model: choose a single-row or double-row harvester according to the planted area. A wrong configuration does not merely cost more for equipment; it means missing the harvest window.

2

Mulching determines the planter: plastic-mulched planting areas must use a mulch-compatible planter; otherwise, planting through the film still requires manual work.

3

The interval determines vine cutting: vine cutting and harvesting require a time interval, so the vine cutter is configured by working backward from the harvest schedule.

4

One source determines the package: all four operations come from the same factory, China's largest specialized potato machinery manufacturer. Interface specifications are matched before leaving the factory, eliminating multi-factory coordination risk.

Delivery & support

The solution includes equipment delivery, installation, commissioning, and operator training. Complete machines carry a 12-month warranty, wear parts are supplied at long-term cost pricing, and after-sales requests are centrally handled by the platform with a response within 24–48 hours.

Products in this solution

Submit your project requirements

Submit your project requirements and receive a customized package solution within 24–48 hours.